Previous Image | Next Image | ||||||
Description:
Picture Stats: Views: 4251 Filesize: 25.78kB Height: 500 Width: 375 Posted by: PwrWgnWalt at June 04, 2013, 04:13 PM Image Linking Codes
|
PwrWgnWalt Posts:204 | June 04, 2013, 04:29 PM This shows all the power & monitoring equipment. At top left is the Intellitec BD-2 Battery Disconnect; it allows for isolation of either battery bank (Coach or Chassis). The red LEDs indicate they are ON (in use). At upper right is the Trimetric 2025-RV, shown here with the engine running: the alternator is charging Battery 1 (Coach battery bank) at 14.4 volts. In the lower part is the factory monitor panel - with a replacement LP (propane) gauge at lower right (VDO 301-303D, 0-90 ohm). I installed the green LED in the panel to indicate when the Blue Seas SI-ACR-7610 has 'Connected" both battery banks together (ACR stands for "Automatic Connecting Relay" - it senses when there is a charge being applied to either battery bank, and if it is over a certain threshold for a certain period, it will connect the battery banks so both get charged. This works for any charging source applied to either battery bank.) |